Wellcome to National Portal
মেনু নির্বাচন করুন
Main Comtent Skiped

পঞ্চবার্ষিকী পরিকল্পনা

Arshinagar union council office
Po, Charakumaria, Bhedarganj, Shariatpur.
Five Year Plan - From 2022-23to 2026-27

WARD NO 2022-2023, 2023-2024, 2024-2025, 2025-2026, 2026-2027
01 a) Establishment of one public latrine in the market of Noor Mohammad Master (L., G, S, P)
B) Establish one deep tube well in Fazlul Haque Bepari's house (L, G, S, P)
C) 12 ring slab latrines in Ali Mia Dewan, Azizul Chokdar, Mokbul Mollah, Habib Mand, Gafur Mal, Ahsan Ullah Madrob, Zahirul, Khaleda Begum, Shahabuddin Bala, Khorshed, Suruj Dewan, Amajat Hawlader Erbari. (L, G, S, P)
Construction of road upto Tallola Switch Gate along the house of Chhoy Sardar of Ward No. 1 (A): (a) Deep tube-wells (LGSP) at different places of Ward No. 1
(B) shallow tube-wells (LGSP) at different wards of Ward No. 1
(C) Construction of road from Rashid's house to road constructed (AWD): Construction of wooden pool with iron angle (LGSP) in the adjacent river of Nura Master's Market
(B) Rebuilding the road up to the road from the house of Tamizal Pedda to Wahab Hang's house
(AWD): Progress of Ward No. 1 from Bidya Niketan S Prash B to Taltola Switch Gate, Brick Soling Construction (LGSP)
(B) Road from the Tantola Switch Gate to the shop of Jalu Sikder (AWD): RCC Welding (LGSP) in Naura Master's Market Ground
(B) Restoring the brick rug of the brick in the market of Burra Master from Sikder Kandi Sikder House (AWD).
02a) Distribution of cultural and cultural materials in various educational institutions of Arshi Nagar Union
Haji Haji Ghar government at Ward No. 2
Supply of furniture in primary school.
B) Building from the Abul's shop No. 2 in Ward No. 2 to the Haji Ghar Government Public Trust. (A.) (A) To establish a deep tube well (LGSP) in Banir Uddin Sardar
(B) The installation of a deep tube well in the Bar of Nasir Sardar. (LGSP)
(A) Haji Ghar Saptaprabi Field Fill (LGSP)
(B) Haji Houses from Sapprobrabi to rebuilding the road up to Abul's shop (AWD) (a) Hai Ghuli Prasabibi to Abul's shop till the building of the lighthouse (LGSP)
(B) Dugging canal adjacent to Taltala switch gate (kabita) (a) Repair of wooden pumps on adjacent canals adjacent to the World Road. (LGSP)
(B) Construction of boundary walls in the graveyard of Rashid Sardar; (T.R.)
03 To establish a deep tube well in the house of Mozaffar Hawlader (a) A deep tube-well installation (ADP) in Ayub Khan Balla's house
B) Wood pool construction (LGSP) on the canals adjacent to Shahidullah Sardar's house
A) Brick Soling Construction (LGSP) from World Road to Khanjana Mridha's house
A) Mridha Ghar Government Pvt. Filling the soil in the field of soil, (kabita)
(I) Road construction from Roads of Road to Mostafa Madar (AWD): A) Mridha Ghar, Government Private Limited, BBA, Aadha Patra Supply (LGSP)

04 a) Solar construction of brick from the head of the street from Altaf Chayyal's house to Rahman Chowdhury.
B) Building a deep tube well in front of Ahsan Hawlader's house:
C) Ward no. 4 adjacent to Achan's house
Lv ‡ ji dci kv ‡ vi cyj wbg © vb | (T, R)

D) Jahirul † Ecvixi evox nB ‡ Z Wahab AvLb Gi Wooden garden ch © šÍ iv¯ív cybt wbg © vb | (Kabita)
E) Construction of road from Giasuddin Achan Sr.Pr. to Ward No. 4 to Belayet Hawlader's house. (AWS) (a) Gias Uddin Achan Government Primary B- Supply of LPG (LGSP)
B) Development of Rupnagar Bazar Jami Mosque (Kabita) (a) Sewing Machine Distribution (LGSP)
B) To install shallow tube wells in different homes (1%)
A) Aakhan house Jami Mosque Development (T.R.)

B) Aakhan Home Government Pvt. (LGSP) a) Rebuilding the road from Ghias Uddin Achan S Prabby to Razzaq Balar's house (AWD)
B) Razzak Ballar's house development of Jama Masjid (Kabikha)
05 a) Government House of 5th Ward Government Pvt
B. Supply of furniture sheet
B) Ward no. 5 in the different villages of different villages supply ring slab
C) Construction of roads upstream from the wooden bridge of adjoining the evox of Nazrul Sardar. (T, R) a) Construction of roads from Amajat Majhi's house to Rupnagar Bazar (AWD)

(B) Rebuilding the road from Bachchu Government House to the south side of the woods (kavikha) (a) Two deep tube-wells (LGSP)
B) Hajil mujhi house from Rafizul Majhi's house
Road construction till
(AWC) a) Wooden building built of wooden house house (kabita)
(B) Building a wooden bridge on the adjacent canal of Aluddin Mollah (LGSP a) Government House Government B. (LGSP)
B) Development of slum house Jami Mosque (Kabikha)
Construction of wooden pumps on the canal adjacent to the house of Rafiq Mollah in 06 no. (A) Development of UDC (LGSP)

(I) Rehabilitation of roads from Kanchan Sardar's house to Zakir Sardar's house (A) (a) To set up lanatrans containing lamps in different homes (LGSP)
(I) Rehabilitating the road from the house of Sharif Balar to Khokan Bepari's house (AWC) a) Development of Urban Unions (LGSP)
(B) Reclamation of road from the house of Faruk Sardar to Mullu Chan's house (AWC) a) Development of Arshinagar Bazar Jame Mosque
(Kavakha)
B) Filling the soil in the middle slopes of Arshinagar Parowad Bazar (1%)
Construction of road from the house of Bachchu Molla 07 07 Ward and construction of the road from Sattarpur to the house.
B) Rebuilding the road from the house of Al Badsha to the teat ferry ghat.